BNW Manufacturing Associates, LLC

home

what we do

what to expect

training

clients

partners

contact us

 

Project, Program, Portfolio Management
 

Testimonial

 

 

Case Studies

Review of Best Practices in Product Development; Common Pitfalls using PM Software to Manage Projects; and Stage Gate Product Development Process

View our latest Newsletter:

Best Practices in Product Development

Case Study Archive >

SIGN UP:

 

What We Do

Manufacturing Plant Operations

Production Part/ Assembly Operations

  • Provide improvements to the Engineering database, inventory & MRP system to improve on time delivery, inventory turnover, and obsolete inventory losses.
  • Provide improvements through a systematic approach to reduce rework, scrap, and poor machine utilization.

  • Provide Lean Manufacturing Processes that improve costs, through put, floorspace utilization, and inventory turns.

Tool, Die, Mold, & Special Machine Design & Build Operations

  • Provide a “Hybrid Lean” improvement process that takes all the Lean Manufacturing process techniques and best practices that are specifically applicable to “Engineered to Order” business environment. This includes:

    o Formal, company wide cost reduction program that works

    o Setup and Changeovers

    o Operational Process control on troubled areas of the process

    o Material Transport reductions

    o Machine Utilization using TPM

    o Standard Operation work technology

    o Material Flow- Capacity Planning Capability on Engineered to Order Project

© 2002-2007 BNW Manufacturing Associates LLC.

site by  

website design and managment provided by Computer Works of Toledo